How to cascade a goal dashboard to your team
This article brings together the most common questions about cascading dashboards in Goals, in the Performance module: who can use it, which rules the dashboard must meet, the ways to cascade, the options for applying it and how to track the result.
In this article:
- Words that appear in this article
- Overview
- Rules for cascading
- Cascading modes
- Settings for applying the cascade
- Preview calculation and processing
- Results and history
Words that appear in this article
Word | What it means here |
|---|---|
Leader | The person who owns the dashboard that will be cascaded (the source dashboard). |
Reports | The people below the leader in the hierarchy. They are the ones who receive the cascade. |
Goal group | A set of indicators within the dashboard. Each group has a weight. |
Indicator | Each item on the dashboard. It belongs to a goal group and has its own weight. |
Overview
What is dashboard cascading?
It is a Goals feature, in the Performance module, that replicates a person's goal dashboard to the people below them in the hierarchy. This way, you do not need to build by hand, one by one, the dashboards that follow the same structure as the leader's dashboard.
Who can use cascading?
Only people with the Dashboards - Cascade dashboard permission. It needs to be in your permission group (in Settings › Permissions, Permission Groups tab).
Where is the cascade button?
In two places:
- on the individual dashboard: the Cascade goal dashboard button, next to the Status box. It appears on your dashboard, in Performance › Goals › My Dashboard, and also on another person's dashboard opened from the Dashboards subtab;
- in the dashboard list, on the Dashboards subtab: select the checkbox on the dashboard's row and, in the bar that appears at the top, click the cascade icon (its name appears when you hover over it).

Rules for cascading
Can any dashboard be cascaded?
No. The dashboard must meet two conditions:
- be ready for approval;
- have consistent weights.
The dashboard does not need to have been sent: a dashboard in Building with consistent weights can already be cascaded.
Having consistent weights means the numbers add up: within each goal group, the sum of the indicator weights must equal the group's weight.
How do I know if my dashboard is inconsistent?
You do not need to check it by hand: the system runs this check automatically. When something does not add up, the cascade button is disabled and shows a message explaining why.
The Cascade goal dashboard button turns gray. When you hover over it, a tooltip appears that starts with "Cannot be a source:" and points out the cause, for example, in which goal group the sum of the indicator weights does not match the group's weight. In the Dashboards list, the checkbox of a dashboard that cannot be a source is disabled, with the same tooltip.

Does the sum of the goal groups have to be exactly 100%?
It depends on the settings. With the Allow flexible goal group allocation option turned on, the sum of the groups does not need to be exactly 100%. The option is in Settings › Account › Performance, under Goals Context.
Cascading modes
What are the ways to cascade?
In the cascade form, you make two choices: What to replicate and How to apply. In What to replicate, the difference is in what goes from the leader's dashboard to each person's dashboard:
Option | What it replicates | When to use it |
|---|---|---|
Full dashboard | The goal group weights and all the indicators. | When you want to replicate the entire structure of the leader's dashboard. |
Group weights only | Only the planned weights of the goal groups. | When each person will define their own indicators, but the split between the groups should follow the leader's. |
In How to apply, you choose between Mirror and Complement.
Can cascading remove indicators from the person's dashboard?
It can. Depending on the options chosen in the form, the indicators that the person had and the leader does not have are unlinked from their dashboard. The cascaded dashboard records the source and the reason for the unlinking.
Settings for applying the cascade
When you cascade, you choose a few options in the cascade form. The questions below explain each one.

Can I cascade only to my direct reports?
Yes. In How far, you choose between two options:
- Direct reports (the people right below the leader);
- Entire chain (the direct reports and also the people below them).
Does cascading overwrite dashboards that already exist?
It depends on the settings. In Advanced options, there are two toggles to skip dashboards that already exist: Skip approved dashboards and Skip already consistent dashboards. If you turn these toggles off, the existing dashboards are overwritten, that is, the cascade writes over them.
What if the person does not have a dashboard yet?
Use the Create a dashboard for those without one in the cycle toggle, also in Advanced options: it creates a new dashboard for those who do not have one yet.
What will the status of the dashboards be after cascading?
You choose the final status in Resulting dashboard status, from three options:
- Keep as is
- Submit for approval
- Approve
Do I need any extra permission to approve the dashboards when cascading?
Yes. Besides the cascade permission, you need the Dashboards - Approve dashboard permission. Without it, the Approve option is not available for you to choose in the cascade form.
Preview calculation and processing
What is the preview calculation?
It is a simulation that validates the changes before applying them. This way, you see the impact of the cascade and only then confirm. The calculation starts with the Calculate preview button, at the end of the cascade form.
How long is the preview calculation valid?
For 24 hours. After that, run the calculation again before applying.
Can two people cascade at the same time?
Not in the same cycle. The system processes one cascade at a time in each cycle, so that one does not overwrite the other. While a cascade is being processed, no one else can cascade in that cycle.
What if someone changes the dashboard between the preview calculation and the application?
The system detects the change and marks the person as divergent in the result.
What happens to the people marked as divergent?
Their dashboard does not change in that cascade. To apply it to them, just run a new cascade.
Results and history
How do I track what was done?
Through the cycle history. On the Dashboards subtab, the Cascades in this cycle icon, next to the refresh button, opens the window of the same name. It has the Date, Executed by and Status columns, which show when the cascade was run, who ran it and what its status is.
The details by person and the report appear only to the person who ran the cascade.

What does the history show about each person?
For the person who ran the cascade, the details show each person with one of these statuses:
Status | What it means |
|---|---|
Applied successfully | The dashboard received the cascade. |
Ignored | The dashboard was skipped according to the chosen settings, for example, because it was already approved or consistent. |
Divergent | The dashboard was changed between the planning and the run of the cascade. |
Can I tell that a dashboard came from a cascade?
Yes. The cascaded dashboard shows its source: in the Dashboards list, below the person's name, Cascaded from appears, followed by the name of the person who originated the cascade. When applicable, the dashboard also shows the reason why indicators were unlinked.
Can I download the results?
Yes. You can download a spreadsheet report with the details. Only the person who ran the cascade sees the report.
Can I undo a cascade?
No. Once applied, a cascade cannot be undone. So check the preview calculation before applying.
Updated on: 23/11/2026
Thank you!
